433 Central Ave., 4th Floor, St. Petersburg, FL 33701 | info@poseidon-us.com | Office: (813) 563-2652
The Best-in-Class model reflected a highly bureaucratic, cumbersome approach built on specific criteria relating to contract terms and conditions. The post FAR & Beyond: Time to retire the best-in-class regime? first appeared on Federal News Network.
http://news.poseidon-us.com/TN2ptl