433 Central Ave., 4th Floor, St. Petersburg, FL 33701 | [email protected] | Office: (813) 563-2652
The first group of satellites will be launched in the “March-April time frame,” and the agency is “starting to cut metal” for Tranche 2. The post SDA prepares for next batch of satellites with Tranche 1 launch in March first appeared on Federal News Network.
http://news.poseidon-us.com/TGGtf4